Early April 2020: First floor concrete, pre-pour.
Early April 2020: Starting to deck the 2nd floor.
Early April 2020: 2nd floor is poured (Roseann Sheridan, CTM pictured).
April 15, 2020: View near the front entrance: starting to look like a structure.
April 29, 2020: 3rd floor deck being poured.
Early June 2020: More structure
Early July 2020: Interior framing in progress.
Early July 2020: Exterior pane framing in progress.
Mid July 2020: More structure and exterior work.
July 22, 2020: Masonry work for black box, top of elevator shaft in view.
Early August 2020: A view looking down into the production shop.
Early August 2020: A view inside Studio 4D, our largest rehearsal studio.
Early August 2020: Inside the black box.
August 19, 2020: 4th floor, looking at area theater will be framed.
August 19, 2020: Outside front entrance.
September 3, 2020: Rear stairs